Case Studies



Athenta has proven its product robustness across marquee projects. Some key examples are stated below.



The Rapid transit system in Gurgaon is designed to facilitate 30,000 commuters every hour with three coach trains to run at 3 minute intervals, each carrying 1,000 passengers, at a maximum speed of 90 km/h. Athenta provided a web-based platform, that communicates effectively with all the other disparate sub-systems and devices from different vendors at the station and Operation Control Centre (OCC) level and co-relate their interdependencies. Created a ‘Standard Operating Environment’ for the Metro Operations and established best in class service uptime with 20-30% reduction in CapEx and reduction in OpEx with reduced number of people manning stations.
Enabling high business availability & resilience across all data centre & network room assets with an integrated – IT/OT management approach across all asset classes. Athenta provided a Web-based platform that was able to communicate effectively with all the other disparate sub-systems and devices from different vendors and co-relate their interdependencies and was able to proactively alert the operations staff on any performance degradations or change in status. It had a 2-Tier redundancy, built-in escalation management at field device level and SLA management. This resulted in increased datacenter uptime and operational efficiency and business time improvement through unified management and energy optimization resulting in 30% OpEx reduction.
Hindustan National Glass & Industries Limited – Developed and implemented one single solution that brought about operational efficiency and saved a lot of energy getting wasted, adding to the unforeseen bottom-line. Managed the blast furnace temperatures. Keeping tab on grid power and DG power. AMR of 3 different energy meters (total energy meters – 120), secure meters, Satec Meter and Conzerv 6400 (now Schneider)